E-mail: gaohao10010111@gmail.com
SYS · OEM/ODM READY

Precision Door Hinges & Furniture Hardware

10 years exporting door hinges and furniture hardware to Germany, Japan, and the United States. FOB terms. MOQ 1000 units.

Precision Door Hinges & Furniture HardwareSample image
SYS · OEM/ODM READY
10+ years
Export Experience
1000 units
MOQ
25 days
Production Lead Time
7 days
Sample Time
[3] Export Record

Verified Export Record

Trusted by importers in Germany, Japan, and the United States with consistent delivery performance.

51
shipments on record
2025202626
HS 94059940HS 94059950HS 94054210

Based on 51 customs shipment records, 2025-12–2026-02. Source: global customs data.

[4] Products

Core Product Range

High-tolerance door hinges and durable furniture hardware for global OEM/ODM partners.

Heavy-Duty Steel Door Hinge — Sample imageSample image

Heavy-Duty Steel Door Hinge

Cold-rolled steel, precision-ground hinge pins, MOQ 1000 units.

Soft-Close Cabinet Hinge — Sample imageSample image

Soft-Close Cabinet Hinge

Adjustable damping, corrosion-resistant finish, MOQ 1000 units.

Furniture Drawer Slide — Sample imageSample image

Furniture Drawer Slide

Stainless steel rails, smooth glide, MOQ 1000 units.

[5] Industries

Industries We Serve

[6] Why Us

Why Choose Us

10-Year Export Track Record

Consistent delivery of door hinges and furniture hardware to Germany, Japan, and the United States.

25-Day Production Lead Time

Reliable turnaround from order confirmation to shipment for on-time project execution.

7-Day Sample Turnaround

Fast sample production supports rapid design validation and approval cycles.

1000-Unit MOQ Flexibility

Scalable minimum order quantity for efficient bulk manufacturing without overcommitment.

[7] Process

Export Workflow: Precision Timelines

Streamlined cooperation from inquiry to delivery with measurable milestones.

Inquiry Received

Response within 24 hours — guaranteed. All inquiries are acknowledged promptly for fast alignment.

Quotation Delivered

Detailed pricing and terms provided within the 24-hour response window. MOQ: 1000 units.

Sample Shipped

Samples dispatched in 7 days. Confirm fit, finish, and function before production.

Production Initiated

Production begins after sample approval. Lead time: 25 days from confirmed order.

Quality Control

Rigorous in-line inspection per international standards. Final checks pre-shipment.

Shipment Dispatched

On-time dispatch under agreed Incoterms. Export-ready packaging ensures safe arrival.

[8] Quality

Quality Control Standards

[9] Cases

Proven Export Performance

🇩🇪DE

German Cabinet Hardware Supplier

Supplied 50,000 precision door hinges ± tolerance. Shipped within 25-day production lead time

🇯🇵JP

Japanese Appliance Component Vendor

Provided 12,000 drawer slides meeting export specifications. Sample approval completed in 7 days.

🇺🇸US

US Home Furnishings Distributor

Delivered orders on schedule for 18 months. Inquiry response within 24 hours.

[10] Markets

Exporting to Global Industrial Markets

Trusted by procurement teams across Germany, Japan, the United States, and France with consistent quality and on-time delivery.

Germany
Japan
United States

Ready for Reliable Global Supply?

Get a quote with 24-hour response and confirmed lead times.

Get a Quote